Electrical load shedding
ID: electrical-load-shedding
Electrical load shedding deliberately reduces connected electrical load when the available supply or operating constraints cannot support the original demand. It can disconnect selected loads or reduce their requested power. The immediate goal is a feasible remaining electric power system, with an explicit account of which service is no longer supplied.
For an original microgrid example, generation and usable storage output total , requested load is , and losses are stipulated as . At least of load must be removed in the fixed-loss model:Suppose the optional loads are indivisible blocks of 8, 12 and 15 kilowatts. Disconnecting the 8 and 12 kilowatt blocks meets the deficit exactly, while disconnecting only the largest block does not. The choice also depends on which service must be retained; arithmetic capacity alone supplies no priority rule.
Timing matters as well as the final power balance. A deficit sustained for consumes from internal energy storage before a load action takes effect. In the rotating-machine model of electric power balance during a demand step, that draw reduces rotational kinetic energy and can reduce generated frequency. A final balanced state does not prove that the intervening trajectory stayed within operating limits.
Automatic low-frequency schemes are assessed using dynamic models, not only static subtraction. WECC's primary assessment simulated generation deficits at several load conditions and monitored frequency decline, minimum frequency and recovery. It explicitly distinguishes a simulation study from observed field response.[ref]
2024-2026 Underfrequency Load Shedding Program Assessment by WECC. Printed p.4, Executive Summary; p.12, Generation–Load Imbalance Creation and Frequency Performance and Monitored Buses
The report's settings and scenarios are particular to that assessment, not universal instructions for another network.A proposed small-system test imposes a known supply shortfall, records detection and disconnection times, and measures served load, source power, terminal electric potential difference and frequency through the event. Check subsequent restoration separately: reconnecting all removed loads at once can recreate the original demand step. The power-rating limit versus energy autonomy in a microgrid distinguishes a shortfall in instantaneous output from depletion over a longer interval; both can motivate different load-management decisions.