Optical path delay in crossed-beam interference

ID: optical-path-delay-in-crossed-beam-interference

For the right-angle geometry of temporal coherence from crossed beams, a physical arm-path delay gives , with the sign set by the delayed arm. A quarter-cycle optical phase delay requires ; it shifts the fringe pattern by a quarter of its period, . A path delay equal to that latter length is a different operation. Replacing the shifted correlation by a phase multiplier additionally requires the delay to be small compared with the envelope optical coherence time.

New to topics? Read the docs here!