Power of a Brinkman sheet

ID: power-of-a-brinkman-sheet

For , the leading work per projected area on one side of a transverse Brinkman swimming sheet is . Two fluid sides double it. Work includes viscous dissipation and drag against the matrix, giving a greater fixed-stroke cost than in the unscreened fluid.

New to topics? Read the docs here!