Swing-foot clearance

ID: swing-foot-clearance

Swing-foot clearance is the separation between a robot's swinging foot and the terrain or obstacles it must pass. It concerns the whole swing phase, not just the maximum foot height. For a finite foot, use the relevant lowest material surface or full collision geometry; the height of a chosen ankle coordinate can differ from actual clearance.
An original point-foot model isolates vertical geometry. Let a planned foot position be and terrain height be , with swing parameter . Define
Ground contact at the beginning and end normally gives zero endpoint clearance, so a positive lower bound must be assigned to the obstacle-crossing part of the path rather than incorrectly demanded throughout the closed contact-to-contact interval.
Use the constructed path
Suppose a flat-topped obstacle of height occupies the horizontal range corresponding to , namely to . With , the lowest foot height over this interval is , attained at its edges. The minimum nominal obstacle clearance is therefore only even though peak foot height is .
A robust swing-foot clearance margin includes specified error bounds. If actual foot height can be below its plan and actual obstacle height above the model, the guaranteed clearance is at least
Thus the nominally clear path permits collision within those bounds. Guaranteeing at least above this obstacle under the same errors requires
The bounds add because both deviations can reduce clearance at once; they are deterministic limits, not independent standard uncertainties to combine by root-sum-square.
Greater height changes the leg's motion requirements. For a fixed swing duration , this path has maximum vertical speed and accelerations proportional to . Clearance, timing, inverse kinematics and actuator constraints must therefore be checked together. A terrain discontinuity, horizontal position error or non-point foot additionally requires the corresponding geometry rather than just this vertical formula.
The primary planning text treats clearance as a possible planning objective and distinguishes local geometric constraints from dynamic ones.[ref] A proposed robot test measures the foot surface and obstacle geometry in a shared reference frame, records the trajectory throughout the crossing, and compares the minimum separation with the stated bounds. Observing a high midpoint alone does not test the minimum-clearance claim.

New to topics? Read the docs here!