A clearance bound between trajectory samples converts finitely many separation checks into a guarantee over a continuous trajectory, using a justified bound on how quickly clearance can change. Clear endpoints alone are insufficient: a foot or another robot part can approach an obstacle and move away again between them. The primary planning formulation requires constraints along the entire path.[ref]
Let nominal clearance have Lipschitz constant on a checked interval of length . If both endpoint clearances are at least , then every intermediate point is within of an endpoint. Consequently
This follows directly from using the nearer endpoint. A uniform additional worst-case geometry or execution allowance gives actual clearance at least .
A tighter interval certificate retains the two different endpoint values, and . Writing gives two lower cones,
If and , the cones meet inside the interval. Their common height yields
If the endpoint difference exceeds , the proposed Lipschitz bound and exact endpoint values are inconsistent; simply applying the formula does not repair that inconsistency. With , clearance is constant.
For an original example, take , , and . The simpler endpoint-minimum bound gives ; the two-cone bound gives . Subtracting a execution allowance leaves a certified actual gap, sufficient for a requested margin. These are lower bounds, not assertions that the trajectory reaches their values.
A counterexample explains why the allowance is necessary. On , has endpoint values one but touches zero at the midpoint. Checking only those endpoints misses the contact. Its derivative is bounded in magnitude by four, so a sufficiently fine sample grid with that valid bound can expose the missing guarantee.
The constant must match the geometry and parameter units. For a point moving relative to a fixed closed obstacle set, the distance to that set changes by at most the point’s displacement: the triangle inequality gives . A speed bound therefore supplies a time-based clearance bound. A rotating body requires a bound on every occupied point, such as the angular clearance bound for a rotating body; terrain-height clearance across a discontinuous edge cannot use a finite slope bound across that jump.
Adaptive clearance sampling subdivides intervals that fail the chosen certificate, concentrating computation where the margin or speed bound is least favorable. Failure of a conservative certificate means the interval needs better bounds or further checking; it does not itself prove a collision. For a proposed robot-foot test, validate the motion and geometry error bounds in one coordinate frame and compare the certified interval minima with dense independent measurements. Use the robust swing-foot clearance margin allowances without counting the same uncertainty twice.
A robust swing-foot clearance margin is a guaranteed lower separation between a robot's swing foot and terrain over a specified crossing interval and set of allowed errors. It differs from clearance computed only for a nominal trajectory. The interval must exclude intended ground contacts when a strictly positive margin is required.
An original point-foot model lets the planned terrain be and the planned clearance be . Assume actual vertical foot error , horizontal error , and terrain-model height error bounded by . If has Lipschitz constant over the relevant neighborhood, then
The actual clearance consequently satisfies
This follows from the triangle inequality and covers all errors in the stated bounds. Their effects add in a worst-case calculation; combining them as independent random standard uncertainties would answer a different question.
For a local sloped-terrain example, take , , and . The total clearance allowance is . Guaranteeing a margin therefore requires nominal clearance at least throughout that crossing. A nominal gap gives only a lower bound and cannot certify the requested separation.
Finite path samples need another allowance. Suppose the nominal clearance as a function of path parameter is Lipschitz with constant , and every point lies within of a checked sample. If the smallest sampled clearance is , a clearance bound between trajectory samples gives
With per unit parameter and sample spacing , between-sample uncertainty costs another . The preceding example would then require sampled clearance at least for a certified margin.
Bounds must match the geometry. A vertical obstacle edge is not covered by a finite height-slope bound across its discontinuity; use the full configuration-space obstacle instead. Shared coordinate-frame errors can also cancel in a relative clearance, so separate component bounds can be conservative when their joint dependence is known.
The primary robotics formulation requires constraints along the full path and distinguishes planned from executed motion.[ref] A proposed test records terrain and foot geometry in one reference frame, validates the stated error bounds, and compares a continuous-path certificate with observed minimum separation. A passing sample grid without the intervening bound does not establish the same guarantee.