= Clearance bound between trajectory samples
A <clearance bound between trajectory samples> converts finitely many separation checks into a guarantee over a continuous <trajectory>, using a justified bound on how quickly clearance can change. Clear endpoints alone are insufficient: a foot or another <robot> part can approach an obstacle and move away again between them. The primary planning formulation requires constraints along the entire path.<Robotic Systems by Kris Hauser>[Chapter 8, Point-to-point path planning: continuous path satisfying feasibility for every path parameter]{ref}
Let nominal clearance $c(s)$ have <Lipschitz constant> $L$ on a checked interval $[s_i,s_{i+1}]$ of length $h$. If both endpoint clearances are at least $c_{\min}$, then every intermediate point is within $h/2$ of an endpoint. Consequently
$$
\boxed{c(s)\ge c_{\min}-Lh/2.}
$$
This follows directly from $c(s)\ge c(s_i)-L|s-s_i|$ using the nearer endpoint. A uniform additional worst-case geometry or execution allowance $e$ gives actual clearance at least $c_{\min}-Lh/2-e$.
A tighter interval certificate retains the two different endpoint values, $a=c(s_i)$ and $b=c(s_{i+1})$. Writing $u=s-s_i$ gives two lower cones,
$$
c(s)\ge\max\{a-Lu,\ b-L(h-u)\}.
$$
If $L>0$ and $|a-b|\le Lh$, the cones meet inside the interval. Their common height yields
$$
\boxed{\min_{[s_i,s_{i+1}]}c(s)\ge(a+b-Lh)/2.}
$$
If the endpoint difference exceeds $Lh$, the proposed Lipschitz bound and exact endpoint values are inconsistent; simply applying the formula does not repair that inconsistency. With $L=0$, clearance is constant.
For an original example, take $h=0.10\,\mathrm s$, $L=0.20\,\mathrm{m\,s^{-1}}$, $a=18\,\mathrm{mm}$ and $b=26\,\mathrm{mm}$. The simpler endpoint-minimum bound gives $8\,\mathrm{mm}$; the two-cone bound gives $12\,\mathrm{mm}$. Subtracting a $4\,\mathrm{mm}$ execution allowance leaves a certified $8\,\mathrm{mm}$ actual gap, sufficient for a requested $5\,\mathrm{mm}$ margin. These are lower bounds, not assertions that the <trajectory> reaches their values.
A counterexample explains why the allowance is necessary. On $[0,1]$, $c(s)=1-4s(1-s)$ has endpoint values one but touches zero at the midpoint. Checking only those endpoints misses the contact. Its derivative is bounded in magnitude by four, so a sufficiently fine sample grid with that valid bound can expose the missing guarantee.
The constant must match the geometry and parameter units. For a point moving relative to a fixed closed obstacle set, the distance to that set changes by at most the point’s displacement: the <triangle inequality> gives $|d_O(x)-d_O(y)|\le\|x-y\|$. A speed bound therefore supplies a time-based clearance bound. A rotating body requires a bound on every occupied point, such as the <angular clearance bound for a rotating body>; terrain-height clearance across a discontinuous edge cannot use a finite slope bound across that jump.
<Adaptive clearance sampling> subdivides intervals that fail the chosen certificate, concentrating computation where the margin or speed bound is least favorable. Failure of a conservative certificate means the interval needs better bounds or further checking; it does not itself prove a collision. For a proposed <robot>-foot test, validate the motion and geometry error bounds in one coordinate frame and compare the certified interval minima with dense independent measurements. Use the <robust swing-foot clearance margin> allowances without counting the same uncertainty twice.