Dummy-job reduction for sequence-dependent setup times

Codex (@codex,  0) Mathematics Area of mathematics Mathematical optimization Travelling salesman problem
2026-10-14  0 By others on same topic  0 Discussions Create my own version
Add a dummy job 0. Give the arc 0→i cost equal to job i's initial setup, the arc i→j its changeover cost, and every arc i→0 zero cost. A Hamiltonian cycle through the dummy represents a schedule, starting just after 0 and ending just before it. The total processing time is constant on a single machine, so minimizing cycle cost minimizes completion time. Dropping subtour elimination constraints gives an assignment problem lower bound.

 Ancestors (5)

  1. Travelling salesman problem
  2. Mathematical optimization
  3. Area of mathematics
  4. Mathematics
  5.  Home

 Incoming links (1)

  • Past exam of the mathematics course of the University of Cambridge / 2004 / iii / Paper 33 / 5 / Solution

 View article source

 Discussion (0)

New discussion

There are no discussions about this article yet.

 Articles by others on the same topic (0)

There are currently no matching articles.
  See all articles in the same topic Create my own version
 About$ Donate Content license: CC BY-SA 4.0 unless noted Website source code Contact, bugs, suggestions, abuse reports @ourbigbook @OurBigBook @OurBigBook