For balanced global error ε, a method second order in both variables can take h∼ε1/2 and k∼ε1/2. With O(1/h)work per time step in one spatial dimension, its cost scales as ε−1. A method second order in space but first order in time instead needs k∼ε, so its cost is O(ε−3/2) under the same per-step cost assumption. Equivalently at fixed h, using k∼h2 rather than k∼h needs about 1/h more steps. A restrictive stability condition or different linear-solver cost can dominate these accuracy-based estimates.