For balanced global error , a method second order in both variables can take and . With work per time step in one spatial dimension, its cost scales as . A method second order in space but first order in time instead needs , so its cost is under the same per-step cost assumption. Equivalently at fixed , using rather than needs about more steps. A restrictive stability condition or different linear-solver cost can dominate these accuracy-based estimates.

Articles by others on the same topic (0)

There are currently no matching articles.