Compare average delivered electrical power per land area with consistent boundaries. Illustrative values are about 1000Wm−2 for the compact plant site of nuclear generation, 5-15Wm−2 for aUK ground-mounted photovoltaic site, 1-3Wm−2 across awind-farm lease area, around 0.5Wm−2 for an energycrop after conversion, and perhaps 5Wm−2 for a reservoir hydroelectric scheme. These are scale estimates, not universal technologyconstants.
At representative values 1000,10,2,0.5,5Wm−2, one average gigawatt requires approximately 1,100,500,2000,200km2 respectively. Biomass therefore has substantial land competition even when fuel can be stored. Solar development competes less with farming if placed on roofs or already developed land. Wind's large separation area is not entirely excluded from agriculture; its actual foundations and roads occupy a much smaller area. Reservoir impacts can be extensive and strongly site dependent.
Anuclear-sitenumber excludes mining, cooling constraints, transport and exclusion areas; awind lease number includes much land still usable for other purposes. Reporting them as identical measures of permanently occupied land would mislead. Deployment decisions need both the average energy yield and the consequences of the particular land boundary, ecology, foodproduction and local acceptance.