Robust swing-foot clearance margin
ID: robust-swing-foot-clearance-margin
A robust swing-foot clearance margin is a guaranteed lower separation between a robot's swing foot and terrain over a specified crossing interval and set of allowed errors. It differs from clearance computed only for a nominal trajectory. The interval must exclude intended ground contacts when a strictly positive margin is required.
An original point-foot model lets the planned terrain be and the planned clearance be . Assume actual vertical foot error , horizontal error , and terrain-model height error bounded by . If has Lipschitz constant over the relevant neighborhood, thenThe actual clearance consequently satisfiesThis follows from the triangle inequality and covers all errors in the stated bounds. Their effects add in a worst-case calculation; combining them as independent random standard uncertainties would answer a different question.
For a local sloped-terrain example, take , , and . The total clearance allowance is . Guaranteeing a margin therefore requires nominal clearance at least throughout that crossing. A nominal gap gives only a lower bound and cannot certify the requested separation.
Finite path samples need another allowance. Suppose the nominal clearance as a function of path parameter is Lipschitz with constant , and every point lies within of a checked sample. If the smallest sampled clearance is , a clearance bound between trajectory samples givesWith per unit parameter and sample spacing , between-sample uncertainty costs another . The preceding example would then require sampled clearance at least for a certified margin.
Bounds must match the geometry. A vertical obstacle edge is not covered by a finite height-slope bound across its discontinuity; use the full configuration-space obstacle instead. Shared coordinate-frame errors can also cancel in a relative clearance, so separate component bounds can be conservative when their joint dependence is known.
The primary robotics formulation requires constraints along the full path and distinguishes planned from executed motion.[ref]
Robotic Systems by Kris Hauser. Chapter 8, Point-to-point path planning and Explicit vs implicit plans
A proposed test records terrain and foot geometry in one reference frame, validates the stated error bounds, and compares a continuous-path certificate with observed minimum separation. A passing sample grid without the intervening bound does not establish the same guarantee. New to topics? Read the docs here!