Here is an explicit Braess paradox. Use four vertices and unit demand from to . The delay on equals its own link flow, as does the delay on ; the delays on and are constantly one. Initially the two routes are and . If the first carries and the second , their delays are and . The Wardrop equilibrium has , so every traveler takes time .
Add a directed link with zero delay. Let the old upper and lower routes carry , and let the new route carry , with . Their delays becomeIf , the upper route is strictly slower than the middle route, contradicting the Wardrop equilibrium condition. Similarly is impossible. Thus the new equilibrium has , and all three route delays are two. ConsequentlyThis is an incentive effect, not a loss of feasible allocations: the old half-and-half flow remains feasible after adding the link. For completeness, its social optimality can be checked directly. Write , . Total travel time in the enlarged network isIt is minimized at , giving the original total time . The Wardrop equilibrium instead incurs total time two, a factor larger. The Beckmann potential and total-delay objectives differ because an extra traveler ignores the delay their presence imposes on others. More generally, adding routes cannot worsen the optimum of total delay when it leaves the previous feasible flows available, but it can worsen a selfish Wardrop equilibrium.
Articles by others on the same topic
There are currently no matching articles.