The feasible triangle has vertices
These come from the three pairs of active boundary lines and satisfy the remaining inequalities. Its denominator is positive at each vertex, with minimum , so is positive throughout the triangle because it is an affine function.
For a direct linear programming optimality certificate, add twice the second inequality to the third to get . Thus , equivalently . Division by the positive denominator gives an objective at most . Both inequalities used in the bound are equalities at , where the first inequality is also satisfied. Therefore
Equality requires the two bounding inequalities to be tight, so this optimizer is unique.

Articles by others on the same topic (0)

There are currently no matching articles.