The Sussman anomaly is a blocks world example in which independently constructing the obvious subplans for two stacking goals gives destructive goal interaction in planning. Clearing a block in advance allows a short joint plan, while prematurely achieving either isolated goal can block the other. It demonstrates the inadequacy of restricted goal-by-goal planning, rather than a prohibition on every possible ordering of final goal achievements. Preparatory actions can make such an ordering succeed. For a concrete instance, start with on and on the table, and require on and on . Moving to the table, then onto , then onto succeeds. The first move is preparation that an isolated shortest subplan for the second stacking goal would omit.

Articles by others on the same topic (0)

There are currently no matching articles.