Asymmetric 2-opt reversal cost

ID: asymmetric-2-opt-reversal-cost

A 2-opt schedule move reverses a consecutive block , reconnecting its boundary arcs. With directed costs, its change is
Omitting the internal sum is valid only for symmetric costs. A simulated annealing step accepts an increase with probability ; a strictly positive temperature permits escape from local minima.