A 2-opt schedule move reverses a consecutive block , reconnecting its boundary arcs. With directed costs, its change isOmitting the internal sum is valid only for symmetric costs. A simulated annealing step accepts an increase with probability ; a strictly positive temperature permits escape from local minima.
Articles by others on the same topic
There are currently no matching articles.