Let clip the minimum of independent exponential sample means into , with . The rate function under scalar clipping is the minimum cost on this interval. Apply Varadhan's lemma to . On the lower side its objective is increasing; on the upper side its derivative is . Thus the optimum is once , giving the displayed limit. The expectation is of the high power, rather than a power of the mean; the latter has limit .
Varadhan's lemma states that if has a large deviation principle with good rate function and large-deviation speed , then for every bounded continuous real function ,
For a continuous function unbounded above, the same conclusion holds under the exponential tail extension of Varadhan's lemma, for example when the weighted contribution from is superexponentially negligible as .
The scalar clipping map is continuous. The rate function under scalar clipping has endpoint costs and . Since and the costs decrease towards from the left and increase to its right, both infima are attained at the corresponding endpoints. Thus the good rate function of equals on and is infinite outside. The function is bounded and continuous on that compact interval, so
On , the derivative of is , so the maximum there is . On , the derivative is , with negative second derivative. Its unconstrained maximizer is
It lies in whenever . The right-hand objective increases initially at , so this maximizer dominates the whole left-hand interval. Substitution gives the limit for high moments of a clipped minimum of exponential sample means
The moment here is the expectation of the th power. If the printed notation were instead read as , its logarithmic limit would be , since boundedness and convergence in probability give .