Quiet interval required for an RC baseline timing budget

ID: quiet-interval-required-for-an-rc-baseline-timing-budget

The quiet interval required for an RC baseline timing budget controls how much a residual capacitor baseline may advance the next threshold crossing. In residual baseline in RC pulse-width discrimination, a positive baseline changes the relaxed crossing by
For a permitted advance , requiring is equivalent to , where . To retain a fresh rising crossing, also require , equivalently .
After a previous peak , a zero-input low interval gives . Hence a measured upper bound on that peak gives the sufficient interval
Using only the model bound recovers the conservative expression in the header, . The peak bound and initial-state assumptions are part of the guarantee. The next pulse must still last long enough to produce the rising crossing; this timing bound alone does not guarantee acceptance.
For an original timing budget, let , and . Then , and the conservative interval is . If a validated peak bound is only , it reduces to . Simply calling either interval several time constants long would hide the actual timing specification.
For , expansion gives under the full-height peak bound. Tightening a small timing allowance by a factor of two therefore adds roughly of quiet time. If the allowed advance is as large as the whole relaxed crossing time, a separate reset condition is still required; the logarithmic timing budget alone no longer ensures the initial output is below threshold.
A bench test measures the peak and the baseline while sweeping the low interval, keeping the threshold and pulse height fixed. MIT's RC laboratory supplies the natural-decay measurement used to check the underlying time constant.[ref] Probe capacitance and source resistance belong in that measured time constant.

New to topics? Read the docs here!