Let be the platform's proper length, measured in its rest frame . At the single station-frame time , its ends coincide with train endpoints whose simultaneous station-frame separation is . ThusThe platform endpoint world lines are vertical at in the station spacetime diagram. In the train frame they are , so their separation at a common train-frame time is . The two alignment events lie on the tilted line in the train diagram and are not simultaneous there; their separation cannot be used as the platform length measured at one train-frame time. This is the distinction enforced by length contraction.
Articles by others on the same topic
There are currently no matching articles.