Allocation of a deterministic bias budget among baseline constraints assigns how much residual signal-response and background-leakage error each constraint may contribute. Let the allowed total bias be , and let coefficient bounds multiply response errors . Choose nonnegative fractions with and set
If every computed response obeys , the triangle inequality gives . The response-normalized tolerance for baseline-feasibility residuals checks those component limits. Positive tolerances require positive allocated fractions; a zero allocation demands exact cancellation in the stated model.
For an original example, take and bounds of for signal amplitude, for constant background and for linear drift. Allocate fractions , and . The respective bias shares are , and , giving tolerances
Equal bias shares would instead allow each, relaxing the signal-response tolerance to while tightening the drift tolerance to . Both allocations guarantee the same total bound when their assumptions hold; their numerical and experimental demands differ.
An allocation should reflect attainable constraint accuracy and the cost of tightening each response. Cost-weighted allocation of baseline-response tolerances can formalize that tradeoff. Equal numerical tolerances across differently dimensioned conditions do not mean equal physical bias contributions. If a bound is uncertain, use a justified upper bound or include its uncertainty explicitly before calling the total a guarantee.
NIST's pulse-energy apparatus used before/after measurements for baseline and drift correction.[ref] The bounds above are illustrative design choices. This budget controls deterministic leakage within the assumed background family. It is separate from measurement-noise variance, whose covariance contributions must still be propagated.[ref]
A numerical feasibility residual for baseline constraints measures how closely computed pulse-estimator weights satisfy their requested responses. For , evaluate
This is not the same diagnostic as the projected unattainable response in null-space feasibility test for baseline-estimator constraints. That test asks whether a solution exists at the chosen matrix rank; the residual checks the weights actually returned.
Small numerical components need physical scaling. If the measurement model is , an estimator intended to preserve the signal and reject the backgrounds instead has bias
Thus an unweighted Euclidean residual norm is not a universal error bound. Coefficient magnitudes and the units of each constraint matter.
For an original example, suppose the constant-background residual is and the linear-time residual is . A background offset contributes through the first residual. A drift rate also contributes through the second. The much smaller raw numerical value is not a much smaller physical leakage. Expressing time in microseconds changes to without changing that leakage.
A response-normalized tolerance for baseline-feasibility residuals can specify allowed response errors in matching units and check . When coefficient bounds , are justified, the corresponding bias bound is . A noise-minimizing estimator still needs a separate variance calculation from the actual covariance.[ref]
NIST's before/after pulse baselines provide the physical setting for rejecting background and drift.[ref] Report the chosen constraint scaling and tolerated leakage. A small solver residual alone establishes neither low variance nor negligible bias for every possible background.