Let . It is a nonnegative extended random variable, and implies . Otherwise its expectation would be infinite. Intersect this event with the countably many probability-one events on which the individual sample paths are continuous.
For every path in that intersection, . The Weierstrass M-test gives absolute and uniform convergence of on the entire stated time domain. A uniform limit of continuous functions is continuous. Therefore has continuous paths almost surely. The finite expectation is used to obtain pathwise summability before applying this deterministic theorem.
For , use on the tail:
This proves the requested Gaussian tail bound.
The subsequent printed maximum inequality is false as stated. For its integrand never reaches one, and its right-hand side is
But for two independent absolute standard normal variables, using their common distribution function and the standard normal density ,
The middle step is integration by parts with . Thus no proof of the displayed source inequality can hold for all its stated indices.
The correct tail integral formula for expectation is
A valid union bound gives
In particular, for this is at most , where . This corrected estimate proves the intended summability in part (c), without silently replacing the source formula.
Use the valid Gaussian maximum estimate from part (b), with
Split the tail integral formula for expectation at . Bounding the first part by and applying the Gaussian tail estimate to the second gives
Thus . The finitely many small indices also have finite expectation; the bound above already covers them.
By Tonelli's theorem, nonnegativity permits interchanging sum and expectation:
The final series converges because its exponential decay dominates the factor . This establishes the requested conclusion independently of the false bound printed in (1).
In the Lévy construction of Brownian motion, each level is a continuous piecewise linear sum of tents with disjoint interiors. Its supremum norm is therefore the largest absolute tent height, not the sum of the heights. With the standard construction's height standard deviation ,
Part (c) makes finite, and part (a) proves almost sure uniform convergence to a continuous path on . The separately chosen linear endpoint term completes the construction; its Gaussian finite-dimensional distributions and covariance must also be checked to identify the limit as Brownian motion. Independent copies on successive unit intervals extend it to the half-line.
Figure 1.
Disjoint dyadic tents and successive continuous Lévy approximations
. Details.
The source calls a variance. Literally using that variance would give height standard deviation instead. The same maximum estimate still proves uniform convergence, since , but the resulting covariance is not that of the standard Lévy construction. The standard midpoint Brownian bridge variance on an interval of length is . Thus continuity follows under either summable scaling, while Brownian covariance requires the correct variance.

Articles by others on the same topic (0)

There are currently no matching articles.