Distributed energy resource 2026-11-05
A distributed energy resource is a localized source or store of electrical energy connected near the consuming part of an electric power system, commonly through electric power distribution. Examples include a nearby electrical generator, an array of solar cells, and an electric battery with its power-conversion equipment. Energy storage can either absorb or deliver power; calling it a resource does not make it a net source of energy over a complete charge-discharge cycle.[ref]
Microgrid Overview by the U.S. Department of Energy. Printed p.1, Definitions: distributed energy resources; key components
For an original boundary calculation, a site consumes , its solar cells supply at the stated output boundary, and an electric battery supplies . Neglecting site losses, the imported power isIf the same electric battery instead charges at , its signed supply is and import becomes . If solar output rises to while storage is idle, the algebra gives import: an export, provided the connection and controls permit that operating point.
The location matters physically. Local generation can reduce upstream electric current when it offsets downstream consumption, but sufficiently large export can reverse the electric current. In a simplified resistive two-terminal branch, for signed electric current from supply to site; negative makes the receiving-site electric potential difference higher. This is an illustrative direct current relation, not a complete alternating current feeder calculation.
A group of distributed energy resources becomes a microgrid only with an appropriate boundary and coordinated operation. Installed generating capacity alone does not establish that disconnected operation can regulate the local supply. A useful test records import or export together with each resource's signed power, so an apparent reduction in imported energy is not confused with a change in the consuming electrical loads.
Electrical load shedding 2026-11-05
Electrical load shedding deliberately reduces connected electrical load when the available supply or operating constraints cannot support the original demand. It can disconnect selected loads or reduce their requested power. The immediate goal is a feasible remaining electric power system, with an explicit account of which service is no longer supplied.
For an original microgrid example, generation and usable storage output total , requested load is , and losses are stipulated as . At least of load must be removed in the fixed-loss model:Suppose the optional loads are indivisible blocks of 8, 12 and 15 kilowatts. Disconnecting the 8 and 12 kilowatt blocks meets the deficit exactly, while disconnecting only the largest block does not. The choice also depends on which service must be retained; arithmetic capacity alone supplies no priority rule.
Timing matters as well as the final power balance. A deficit sustained for consumes from internal energy storage before a load action takes effect. In the rotating-machine model of electric power balance during a demand step, that draw reduces rotational kinetic energy and can reduce generated frequency. A final balanced state does not prove that the intervening trajectory stayed within operating limits.
Automatic low-frequency schemes are assessed using dynamic models, not only static subtraction. WECC's primary assessment simulated generation deficits at several load conditions and monitored frequency decline, minimum frequency and recovery. It explicitly distinguishes a simulation study from observed field response.[ref]
2024-2026 Underfrequency Load Shedding Program Assessment by WECC. Printed p.4, Executive Summary; p.12, Generation–Load Imbalance Creation and Frequency Performance and Monitored Buses
The report's settings and scenarios are particular to that assessment, not universal instructions for another network.A proposed small-system test imposes a known supply shortfall, records detection and disconnection times, and measures served load, source power, terminal electric potential difference and frequency through the event. Check subsequent restoration separately: reconnecting all removed loads at once can recreate the original demand step. The power-rating limit versus energy autonomy in a microgrid distinguishes a shortfall in instantaneous output from depletion over a longer interval; both can motivate different load-management decisions.
Electric power system 2026-11-05
An electric power system is an interconnected arrangement that produces, transfers, controls, and consumes electrical energy. Electricity generation supplies electrical power, electric power transmission carries it between regions, and electric power distribution delivers it to electrical loads. Electrical generators, electrical transformers, and transmission lines perform different parts of this task. The one-line apparatus diagram in the DOE handbook makes these connections concrete: it follows supplies through switching and protection equipment to consuming circuits.[ref]
DOE Fundamentals Handbook Electrical Science. Volume 4, Module 15, System Components and Protection Devices, printed pp. 1–6, Figure 1
A useful calculation separates delivered power from conductor heating. Consider an idealized two-conductor direct current link delivering at load electric potential difference , with total outgoing-plus-return electrical resistance . Its electric current and resistive loss areDelivering the same power at reduces the electric current to and the loss to . This is a fixed-load, fixed-resistance comparison; it omits converter loss, insulation constraints, and changes in conductor temperature. In an alternating current network, an electrical transformer changes the operating electric potential difference without itself generating the delivered energy.[ref]
DOE Fundamentals Handbook Electrical Science. Volume 4, Module 13, Transformer Theory, printed pp. 11–13, copper loss and efficiency
At each instant, generation, imports, and storage discharge must supply electrical load, exports, losses, and storage charging. A sudden imbalance can initially draw on stored energy; it cannot persist indefinitely without changing the operating state. This electric power balance during a demand step connects network calculations to control and to the smaller, deliberately bounded microgrid.
Islanded microgrid operation 2026-11-05
Islanded microgrid operation supplies a bounded set of interconnected electrical loads from its local distributed energy resources while the external electric power system connection is open. The microgrid's own equipment must then maintain a usable supply and balance demand. The DOE overview explicitly distinguishes this disconnected mode from grid-connected operation and assigns coordination and connection management to the controller.[ref]
For an original steady active power balance, local generation supplies and storage can supply at most . Connected electrical loads request and network losses are stipulated as . The shortfall isAt least of the requested demand must be removed, or more usable supply obtained, for this simplified operating point. A full electric battery does not remove the output limit. Electrical load shedding can balance the remaining demand, but it changes which service is delivered.
Passing the active power calculation is necessary but insufficient. An alternating current island must also sustain appropriate electric potential differences and frequency, accommodate reactive power, and respond to load changes. A power inverter can connect storage to the AC network, but the control capabilities and operating limits of the actual equipment determine whether it can establish or support that supply. The presence of a converter by itself proves none of those capabilities.
A proposed test records the external switch state, individual source power, storage state, load connections, electric potential differences and frequency through the transition into island operation. A load step then tests the local response described by electric power balance during a demand step. Surviving the transition and sustaining the island for a required duration are separate observations; power-rating limit versus energy autonomy in a microgrid explains why both are needed. Reconnection is another controlled operating transition, rather than simply assuming that two energized AC systems already agree in phase.
James L. Kirtley Jr. 2026-11-05
James L. Kirtley Jr. is an electrical engineer whose work concerns electric machines and electric power systems. MIT's departmental profile identifies him as a professor emeritus of electrical engineering, with energy and robotics among his research areas.[ref]
The engineering problem is to match a motor's behaviour to its application. MIT reported in 2016 that Kirtley worked on customized electric motors for the MIT Cheetah robot, where brief peaks of torque serve running and jumping. The same interview describes his interest in electric motors interacting with microgrids, particularly their dynamic behaviour during supply disturbances.[ref]
Electric motors find new roles in robots, ships, cars, and microgrids by MIT Energy Initiative. Sections Electrifying the Cheetah robot and Improving microgrids with smart motors
A short burst and sustained operation place different demands on the system; the largest instantaneous output alone does not describe its operating role.His AC Power Flow in Linear Networks by James L. Kirtley Jr. connects the phasor representation of electric potential difference and electric current to physical energy transfer. In its peak-amplitude convention, complex electrical power is . With RMS phasors and , this becomes . The complex conjugate ensures that the relative phase enters the active power.[ref]
AC Power Flow in Linear Networks by James L. Kirtley Jr.. Energy and Power, equations45–63; Section7.1, RMS amplitudes
For an original load example in sinusoidal steady state, take and electrical impedance , using RMS phasors and the passive sign convention: electric current enters the positive-potential terminal. A series resistor and inductor realize this model at the specified angular frequency when and . ThenThus active power is 48 watts, reactive power is 64 vars, apparent power is 80 volt-amperes, and power factor is . Write and . The corresponding electric potential difference and electric current areMultiplying and applying a trigonometric identity gives instantaneous powerIts cycle average is 48 watts, while its range is watts. The negative portions represent temporary return of stored energy from this ideal load; the electrical resistance still dissipates a positive average. A synchronized product of the two waveforms reveals this behaviour, whereas multiplying their root mean square magnitudes gives only the apparent power.
A phase-shifted load returns energy during part of each cycle while absorbing positive average power
. Original 20 volt RMS example with impedance ohms. The voltage and current have power factor 0.6; their instantaneous product ranges from -32 to 128 watts and averages 48 watts. Values are illustrative rather than measured motor data. Details. Microgrid 2026-11-05
A microgrid is a bounded group of interconnected electrical loads and distributed energy resources that can be controlled as one entity. Its defining boundary and coordinated operation matter: a collection of nearby generators is not sufficient by itself. A microgrid may exchange power with an external electric power system, while islanded microgrid operation supplies its connected electrical loads without that external connection. The DOE overview identifies generation, storage, and the controller as interacting equipment, rather than treating storage capacity alone as a guarantee of service.[ref]
Microgrid Overview by the U.S. Department of Energy. Printed pp. 1–2, definition, main components, and Figure 1
For a worked operating point, suppose a microgrid must supply of electrical load plus of losses. Its solar supply delivers and an electrical generator supplies . Storage must deliverIf the storage system can continuously deliver and has of usable output energy, it can support this unchanged operating point for . Here usable output energy already accounts for the chosen discharge convention; no further conversion loss is silently subtracted.
Now let a cloud reduce the solar supply to . The storage demand becomes , above its rating even with a full store. The controller must obtain more generation or reduce electrical load. This power-rating limit versus energy autonomy in a microgrid explains why an energy budget and an instantaneous power constraint must both be checked. A test of islanded microgrid operation therefore records the external connection state, generation and storage power, and the response of the connected electrical loads, rather than merely checking that a battery is present.