A Monte Carlo estimator is a random approximation obtained from simulated samples, commonly a sample average or a weighted sample average.
For observations, taking the mean of their scalar sum returns that sum, not their sample mean. If is unbiased for a target, replacing the mean by a sum gives expected value and multiplies its variance by . A mean-zero control variate changes variance but cannot correct this missing normalization factor.
At equal proposal count, compare for unnormalized importance sampling with for the accepted-sample mean. There is no universal ordering for nonzero target mean. For zero mean, the bounded-weight inequality gives importance sampling no larger asymptotic variance. Empty rejected samples and per-proposal computational cost are separate considerations.
An additive constant leaves the target variance and accepted-sample mean variance unchanged, but changes the variance of unnormalized importance sampling because its random weights do not sum to one. With g uniform on (0,1), f(x)=2x and M=2, phi(x)=x gives importance variance 16/45 versus rejection proposal-budget variance 1/9. Replacing phi by x-1 gives importance variance 1/45 with the same rejection variance, reversing preference.
A control variate is a random variable with known expected value whose centered value is subtracted from a Monte Carlo estimator to reduce its variance. For a mean-zero vector , put and . When is invertible, the optimal estimator averages and has variance for independent draws. Improvement is strict exactly when .
If is an unbiased estimator and a vector has known mean, then remains unbiased for a deterministic coefficient vector. Its variance is , where and . For invertible , completing the square gives the displayed optimum and minimum variance . With singular , use a generalized inverse on its range. Estimating coefficients from the same simulation can introduce finite-sample bias; fixed pilot coefficients or independent training preserve the elementary unbiasedness assertion.
For uniform on , put and . Then , and estimates the standard Cauchy distribution probability above two. Its variance is , minimized by the displayed coefficient. Here and , so the optimal coefficient is negative. A coefficient estimated using a separate pilot can be fixed for a fresh unbiased production sample.
If a smooth posterior density has vanishing boundary terms, its log-posterior gradient satisfies and
This is a posterior integration-by-parts identity; it concerns differentiation in the random parameter, distinct from the usual mean-zero score identity for sampling distributions. It makes a vector control variate. Finite moments and known coefficients preserve unbiasedness of the Monte Carlo estimator.

Ancestors (5)

  1. Monte Carlo method
  2. Probability and statistics
  3. Area of mathematics
  4. Mathematics
  5. Home

Discussion (0) New discussion

There are no discussions about this article yet.

Articles by others on the same topic (0)

There are currently no matching articles.