For a left-continuous locally bounded adapted process and a continuous semimartingale , the elementary predictable left-endpoint approximations tend pointwise to . Decompose into a continuous local martingale and a continuous finite-variation process. After localization, dominated convergence with respect to the variation measure handles the finite-variation integral. The Itô isometry and Doob L2 maximal inequality handle the martingale integral. The omitted partial last interval is bounded by the local bound on times the modulus of continuity of . This proves uniform convergence on compacts in probability and is the grid-sum foundation of the Itô product rule.
Stop a continuous local martingale at increasing level-and-time stopping times to obtain bounded martingales. Their limits of discrete quadratic variation sums agree before the earlier stopping time, because the sums commute exactly with stopping. These continuous limits patch into a continuous adapted nondecreasing process. On each compact interval, the chance that the stopping time occurs early tends to zero, giving uniform convergence on compacts in probability for the original sums.
Fix a sequence of deterministic partitions with mesh tending to zero and define the completed-increment sums
For a continuous semimartingale, these sums converge to in uniform convergence on compacts in probability, the standard path-increment formula for quadratic variation. The sums use only the path of , and do not mention a filtration. If the same process is a semimartingale for two filtrations, the same sums have both proposed quadratic variations as limits. Uniqueness of limits in probability, followed by continuity, makes these limits indistinguishable.
For the change of measure, let . If , then
truncate at a large constant, use , and then let . Apply this argument to the event . The same sums converge to the P-version of the bracket in Q-probability, and the Q-semimartingale formula makes them converge to the Q-version. Therefore
This is quadratic variation under an absolutely continuous measure change. With only , the equality is asserted under Q: a Q-version is unconstrained on a Q-null set that might have positive P-probability.
For continuous semimartingales , the semimartingale integration by parts formula is
Indeed each partition increment satisfies
Summing telescopes the left side. The first two sums converge to the stochastic integrals by left-endpoint approximation, and the last sum converges to the quadratic covariation by polarization of the quadratic-increment formula. All limits are in uniform convergence on compacts in probability. Hence the equality holds at every time outside one null set, using continuity. In differential notation it is the Itô product rule .
For a vector of continuous semimartingales and , the multidimensional Itô formula is
One route from the product formula is to apply it repeatedly to powers and products of the coordinates, obtaining this expression for polynomials; polarization identifies the mixed second derivatives. Time is another coordinate of finite variation, so it has no quadratic-covariation contribution. Localize to compact ranges, approximate a function and its indicated derivatives by smooth polynomial approximations, and pass to the limit using stochastic-integral continuity and the variation bounds on the finite-variation terms. Equivalently, second-order Taylor expansion along partitions gives the same limit, with integration by parts accounting for every quadratic term.
For an elementary previsible process , with bounded -measurable coefficients, define
The Itô isometry is
More generally the squared distance between the integrals of and is the integral of on the right. The integral is a zero-starting continuous square-integrable martingale.
Elementary predictable processes are dense in . Given in this space, choose elementary converging in its norm and define the Itô integral by the limit of . The isometry proves that this is independent of the approximating sequence and remains valid for the limit. The Doob L2 maximal inequality bounds the expected squared path supremum of the difference by four times its terminal second moment; hence the convergence also gives a continuous martingale version, with uniform convergence on compacts in probability.
For a continuous local martingale and locally bounded process that is previsible, choose increasing stopping times such that is L2-bounded, up to , and . This can be done by combining localizers with first exits of from bounded intervals and the local bounds of . Then is in the integrand space for . Define the integral on each stopped interval by the preceding construction. The stopping property of elementary integrals, extended by the isometry, makes these definitions agree on overlaps. Pasting gives
This is a localization construction; global square integrability of the resulting process is not asserted.
Fix . By uniform continuity of each path of the continuous local martingale on , its modulus
tends to zero almost surely. For every , comparison of powers of each increment gives
The squared-increment sum converges in probability to , by the dyadic definition of quadratic variation. Including the last full grid interval instead of the last partial interval changes that sum by a quantity bounded by , so the ceiling convention has the same limit. In particular these squared-increment sums are bounded in probability.
Since , a quantity tending to zero almost surely multiplied by a family bounded in probability tends to zero in probability. Hence
This is uniform convergence on compacts in probability, and proves the superquadratic case of dyadic power variation of a continuous local martingale.
A left-continuous adapted process is a predictable process. Define the elementary predictable approximation
At every , its sample time approaches from the left, including when is itself a grid point. Thus pathwise by left continuity.
Use the continuous semimartingale decomposition , with a continuous local martingale and a continuous finite-variation process. Localize so that on a fixed horizon , the integrands are bounded by a deterministic constant, is bounded, and the total-variation process of at is bounded. This is possible using local boundedness and the finite pathwise clock and variation.
For the finite-variation integral, the dominated convergence theorem gives
almost surely. For the martingale integral, the Itô isometry and the Doob L2 maximal inequality give
Here the localized bounds justify dominated convergence also in expectation. Remove localization to conclude that the full elementary integrals converge in uniform convergence on compacts in probability to .
The sum of completed intervals differs from the full elementary integral at time by
Its maximum on tends to zero almost surely, by the local bound on and uniform continuity of . Therefore
This proves left-endpoint approximation of a continuous semimartingale integral, including the unfinished interval convention.
Define the quadratic covariation of two continuous semimartingales by polarization:
The available quadratic variation convergence theorem and the polarization identity imply that the sums of products of simultaneous grid increments converge in uniform convergence on compacts in probability to . The quadratic covariation is a continuous finite-variation process, vanishing at time zero.
For a grid ending at , the elementary algebraic identity
telescopes. The first two sums converge by part (a), with the continuous processes as integrands; continuous paths are left-continuous and locally bounded. The last sum converges to the quadratic covariation by the preceding polarization argument. Finally, locally uniformly by continuity. Hence
This is the Itô product rule, or stochastic integration by parts. Uniqueness of the limit in uniform convergence on compacts in probability, followed by continuity, makes the identity hold simultaneously for all outside one null set. The proof used finite-grid algebra, part (a), and the permitted quadratic variation theorem; it did not use the Itô formula.
Write and let denote the printed squared-increment sum for a process , on grid times . We construct its limit first for bounded martingales, then use localizing sequences and the finite variation part of a semimartingale.
Continuity and monotonicity of the bounded-martingale limit. Let be a uniformly bounded continuous martingale. The given result supplies a limit in uniform convergence on compacts in probability. Each is continuous and adapted. A subsequence converges almost surely uniformly on each compact time interval, by choosing summable error probabilities and diagonalizing. Its limit therefore has a continuous version; in the usual completed filtration this version is adapted.
The sums themselves can decrease between grid points, because the last partial increment is being squared. To establish monotonicity, use instead the quadratic variation from completed grid increments
These step processes are nondecreasing, and pathwise uniform continuity gives
where . Thus the same almost surely uniform subsequence of converges to , proving that is nondecreasing. Also .
Localization of a continuous local martingale. Subtract the initial value, which does not affect increments, so that . Set
Continuity gives almost surely and makes bounded. The bounded local martingale criterion makes it a true martingale. Let be its continuous, adapted, nondecreasing limit.
The discrete sums commute exactly with stopping:
For , uniqueness of the probability limit and stability of uniform convergence on compacts in probability under stopping give
up to indistinguishability. Taking a common null set for the countably many pairs, patch these processes into by setting when . Compatibility makes this definition independent of . It is continuous, adapted, and nondecreasing. For each ,
Let and then . This proves the localization and patching of quadratic variation.
Adding finite variation. Decompose the continuous semimartingale as , where is a continuous local martingale starting at zero and is continuous, adapted, and locally of finite variation. For every compact interval, the sum of the absolute increments of is at most its total variation of a function. Hence, pathwise,
The Cauchy-Schwarz inequality bounds the mixed increment sum by
The first factor is bounded in probability, since uniformly on compacts in probability; the second tends to zero almost surely. Thus the mixed term tends to zero in probability. Expanding the square proves
The constructed is continuous, nondecreasing, and adapted. This is the quadratic variation of , and expresses the fact that finite-variation terms do not change quadratic variation.
Put as above. Centering the linear interpolation also interpolates the centered values: for ,
The absolute value of this convex combination is at most the larger endpoint absolute value. For every fixed , part (c) therefore gives
Hence there is uniform convergence on compacts in probability to the deterministic path , by Markov inequality. Equip with its standard compact-open topology, metrized by
For each finite number of terms their suprema converge to zero in probability, and the remaining tail is bounded deterministically by . Thus in probability. Convergence in probability to a deterministic point implies weak convergence of probability measures, so the fluid limit is
Here is the Dirac measure concentrated on that continuous path. The topology is locally uniform convergence; no assertion of uniform convergence over the entire unbounded half-line is needed. The interpolation is intended for integers , including the initial interval . If the PDF's is interpreted as strictly positive integers, that initial piece is omitted from the displayed definition and must be supplied by the same formula using .
The relevant fact is uniform convergence on compacts in probability under an absolutely continuous measure change. Write . For any event and ,
The last term tends to zero as because is integrable. Consequently, implies . Apply this to for each finite and . The given dyadic sums therefore have the same uniform convergence on compacts in probability limit under the new probability measure.
This proves quadratic covariation under an absolutely continuous measure change:
Taking proves the corresponding quadratic variation assertion directly; it has not been assumed. The ceiling in the printed sum includes one grid interval extending beyond . This does not affect the limit: on the resulting extra product is bounded by the product of the two path oscillations on mesh , which tends to zero by uniform continuity on .
The bracket under the new probability measure must be understood as the quadratic covariation of continuous semimartingales. Semimartingale stability under an absolutely continuous measure change ensures this class is preserved; the local martingale property need not be. For example, on a finite horizon, weighting Brownian motion by makes a Brownian motion by the Girsanov theorem, so has nonzero drift under the new measure even though its quadratic variation is still . The PDF additionally assumes that remain local martingales under the new probability measure, so its bracket is also defined directly by the local martingale characterization.
The limit is in probability, or more strongly in uniform convergence on compacts in probability; a pathwise limit for every continuous local martingale is not implicit. The original PDF uses , whereas the supplied TeX changes this to ; both versions have the same limit by continuity.
Put and . For the completed intervals, the algebraic identity
separates a left-point sum from a quadratic covariation sum.
The results from stochastic calculus used are these: predictable left-step approximations to a continuous adapted integrand converge in their Itô integrals in uniform convergence on compacts in probability; and products of increments of continuous semimartingales on deterministic partitions of an interval with vanishing mesh converge to their quadratic covariation in the same sense. The first follows after localization from the Itô isometry and the Doob L2 maximal inequality, since the integrand approximations converge uniformly on compact intervals; the second is the deterministic-partition characterization of quadratic covariation.
Thus the two sums converge to and . For the ceiling convention, at most one additional full interval extends past ; on its absolute contribution is at most times the modulus of continuity of at scale , which tends to zero almost surely. Therefore
A semimartingale is an adapted process of the form , where is a local martingale and is an adapted finite-variation process. A sequence of processes converges to in uniform convergence on compacts in probability, abbreviated ucp, when for every and ,
A càdlàg process is a finite-variation process when, almost surely, for every ,
where the supremum is over every finite partition of an interval .
Uniform convergence on compacts in probability of to means that, for every and ,
Apply the realized absolute covariation theorem to each dyadic partition of an interval. More explicitly, use the continuous increasing clock and the Radon-Nikodym theorem to write
For each time, let have the centered bivariate normal distribution with covariance matrix , and define
This process is continuous and increasing. To prove convergence, localize , represent the pair as stochastic integrals against a two-dimensional Brownian motion, and approximate the integrands in by bounded step previsible processes. For step integrands, the result is the weak law of large numbers applied on each block to independent Gaussian random variables. The Burkholder-Davis-Gundy inequality and the Cauchy-Schwarz inequality make the error uniform on each compact interval in probability. Consequently
in the sense of uniform convergence on compacts in probability.
Let . The stopped process is bounded, so part (a) gives a continuous adapted quadratic variation . These processes agree before the smaller stopping time, because their dyadic sums agree there and the limits are unique in probability. They therefore paste to a continuous adapted process with .
For fixed and ,
The second term tends to zero by part (a), while continuity of on makes . This proves convergence uniformly on compact intervals in probability.
Fix a deterministic horizon and . For every localization index ,
by Markov inequality. Because almost surely, the first term tends to zero as . For fixed , the second tends to zero as . Taking first the limit superior in and then proves
in probability. This is precisely uniform convergence on compacts in probability.