Integrating the joint probability density over the auxiliary coordinate, as in (i), gives the marginal distributionIn particular, augmenting with preserves the target probability distribution of . The other marginal distribution, though not needed to identify , is for . It need not be a uniform distribution on .
The two outcomes are not independent. Conditional on the selected die, the rolls are independent, but sharing the unknown die creates statistical dependence. Each nonfavored face has probability .
The unconditional marginal distribution assigns the following probability to a on either roll:However, by the law of total probability,Thus the joint probability does not factor into the two marginals. Conditional independence given a shared latent choice does not imply unconditional independence.
The marginal distributions have means and . In the joint distribution, is nonzero only at : when , the only possible values of are and . HenceThese quantities are finite; for example, . The covariance changes sign when .
Equality can occur only at the two pairs and . Their combined probability isTaking the complementary probability givesSince , the supplied exponential bound impliesThis is a bound on the mismatch probability for this particular coupling of the two marginal distributions; the variables are not presumed independent.
The joint probability mass function is for . It is nonnegative and its sum over equals one. Summing over one coordinate gives the other variable's marginal distribution.
Poisson count-arrival joint central limit theorem Created 2026-10-25 Updated 2026-10-31
For a rate-one Poisson process with Poisson arrival times , suppose and . Thenwhere and denotes the bivariate normal distribution with standard normal marginal distributions, including the singular cases. In particular, equal scales give and separated scales give .
To prove this, fix real and put for large . The event is exactly . Counts at the two deterministic times are sums of a shared count on and an independent count on the remaining interval. The central limit theorem for a centered Poisson random variable of diverging parameter follows by writing a count at a real time as its count at , a sum of independent unit increments, plus an independent remainder with expected value at most one. Markov's inequality makes that remainder negligible after division by .
Apply this central limit theorem to the two independent count blocks whenever their lengths diverge. A block with bounded length, or length negligible compared with the scale of its coordinate, contributes a term tending to zero in probability. The standardized pair of counts therefore has a joint normal limit whose correlation coefficient isThis includes : the difference block then has negligible variance after normalization. In the arrival event the standardized count at must be at least . Reversing this inequality changes the sign of the second limiting normal random variable, giving the asserted negative correlation coefficient. Continuity of the marginal distributions permits the moving thresholds and the weak inequalities, including at the singular limits.
Every is realized by with , and zero by . Conversely, even when has no limit, it has a subsequence converging in the extended interval . If the original pair has a joint bivariate normal distribution limit, that subsequence has the same limit, forcing its correlation coefficient into .
Product of finite probability distributions Created 2026-10-31 Updated 2026-11-05
Given two finite probability distributions, assign the product of their probability masses to each ordered pair. The support is the Cartesian product of the two positive-mass supports. Distributivity gives . This is the joint distribution for independent coordinate outcomes; it is a construction from the marginals, not a claim that arbitrary jointly observed coordinates are independent.
Random-effects meta-analysis 2026-10-05
For independent study estimates with within-study variances , a usual approximate model is and . Its marginal distribution is , so for fixed heterogeneity the inverse-variance weighted mean uses weights . Here describes the mean effect across comparable studies; represents between-study variation. Estimation and uncertainty for heterogeneity are essential, especially with few studies.
Random vector Created 2026-09-24 Updated 2026-11-05
A random vector is a measurable map from one probability space to , equivalently a tuple of real random variables defined on the same space. Its joint probability distribution contains their dependence information. For example, if is a fair Bernoulli random variable, takes only and , whereas two independent fair Bernoulli coordinates take all four pairs. Both have identical coordinate marginal distributions. A mean vector and covariance matrix summarize the first two moments when finite but generally do not determine the whole law.
Draw two different labels uniformly from using sampling without replacement. Each position has a uniform distribution on a finite set, but . Two independent random variables with those same marginal distributions would match with probability . Equal marginal laws therefore do not make this sample an IID sample. Mark some of those four labels as successes. Their count in the two draws has a hypergeometric distribution; independent Bernoulli trials with a common success probability give a binomial distribution.
Stochastic process Created 2026-09-24 Updated 2026-10-14
A stochastic process describes uncertainty about a whole history: not just the probability distribution of a measurement now, but how measurements at different times fit together. It is a family of random variables on one probability space, with index set . Time is the usual index: for successive observations or for continuous time. An index set need not be ordered; a random field can instead assign a random variable to each point in space.
There are two complementary views. Fix a time and is a random variable; fix a sample space outcome and is one sample path. A model specifies the probability distribution of these histories. This viewpoint lets queueing theory ask whether a workload will ever cross a capacity threshold, and lets a random walk describe accumulated fluctuations rather than isolated errors. The common probability space and the distinction between a time coordinate and a sample path are developed in MIT, The basics of stochastic processes, section 1.
A concrete construction starts with a Bernoulli process of independent fair bits . Keeping records the next trial; adding the signs gives a simple random walk on the integer line, and . Every increment of this random walk is , yet the positions are dependent: contains all the previous increments. Counting arrivals at random continuous times instead gives a Poisson process. These examples separate three questions: what values are possible, how time is indexed, and how the values depend on one another.
For the fair simple random walk on the integer line, the expected value is and the variance is . At time four, returning to zero requires exactly two positive steps, so . A rate-two Poisson process instead has . A single realized sample path does not establish either probability: they follow from the specified joint probability distributions.
The most revealing feature is often dependence. Two stochastic processes can have identical marginal distributions at every time while one forgets everything at the next step and the other repeats its first value forever. Their finite-dimensional distributions and covariance functions distinguish them. That extra structure is what makes a stochastic process useful for prediction.
Student's t-distribution Created 2026-09-29 Updated 2026-10-20
The Student's t-distribution describes a standard normal random variable divided by an independent estimate of its scale. For any real , let have the standard normal distribution and let have the chi-squared distribution, with and independent. ThenThe parameter is called the number of statistical degrees of freedom. It need not be an integer: the chi-squared distribution is a gamma distribution with shape and rate . The independence assumption is essential; specifying only the two marginal distributions does not determine the probability distribution of their ratio.
Its probability density function on the whole real line iswhere is the gamma function. Every member is a symmetric distribution about zero. At it is the Standard Cauchy distribution; as it approaches the standard normal distribution. The essential shape change is the tail: at any fixed finite , decays like a constant times , much more slowly than the standard normal density's exponential decay. Thus it is a heavy-tailed distribution. [ref]
1.3.6.6.4. t Distribution. NIST and SEMATECH e-Handbook of Statistical Methods; NIST/SEMATECH e-Handbook, Section 1.3.6.6.4: density, Cauchy special case and normal limit; the ratio derivation here also permits noninteger degrees of freedom
The left panel shows the centers; the right panel uses a logarithmic scale to reveal the tails that a linear plot hides. All four curves have location zero and scale one. They do not have the same variance: the curve has no finite mean or variance, whereas has variance 3 and has variance .
More generally, the absolute moment for is finite exactly when , as follows by comparing the tail integrand with . ConsequentlyFor there is no finite mean; symmetry alone cannot supply one. For the mean exists but the variance is infinite. For even the centered definition of variance is unavailable because the mean does not exist.
A shifted and scaled version , , has probability density function . The scale is not its standard deviation: for ,For example, and scale give standard deviation , rather than 2. The distinction matters when using a Student's t-distribution to model data with occasional extreme values, as well as when interpreting a Student t confidence interval.
Transport plan 2026-10-05
A transport plan is a coupling of probability distributions , that is, a probability measure on the product space with those marginal distributions. Unlike a transport map, it need not be concentrated on the graph of a function.
Visible unit 2026-10-18
A visible unit represents an observed coordinate of the data. Clamping it means holding that coordinate fixed while other units update. In a Boltzmann machine, hidden units are unobserved coordinates summed out to obtain the visible marginal distribution.

